Ongoing Projects

1 Ongoing
CR202 tunnel 1.png

Design and Construction of a 5-km long bored tunnel between Fairways Drive and Sin Ming Walk for the Cross Island Line Phase Two.

CR202
Tunnels between Fairways Drive and Sim Ming Walk
Picture7.jpg

Design and Construction of Turf City Station and 3km long bored tunnel towards CR205 King Albert Park Station for the Cross Island Line Phase Two.

CR203
Turf City Station and Tunnels
2 Ongoing
APR 2.jpg

Design and construction of 6-km long tunnels between Aviation Park Station and Changi East Depot for Cross Line Phase 1.

CR102
Tunnels between Aviation Park Station and Depot
TWRPPLC1 TC_06529 edit.jpg

TWRP Contract 1

Tuas Water Reclamation Plant

A 6m diameter undersea tunnel with a length of 1.6km and twin 2200mm & 1200mm diameter water pipelines connecting Tuas Water Reclamation Plant and Jurong Island 

TWRP Contract 1
Tunnels between TWRP and Jurong Island
3 Ongoing
IMG_20220418_111832.jpg

Twin bored tunnels from Changi Airport Terminal 5 to Changi Airport (CGA) Station Terminal 2

T316
Underground Infrastructure at Changi Airport
N109A Overview (4).JPG

An 800m long road tunnel featuring 

a pair of three-lane roads to be integrated with Teck Ghee Station on the future Cross Island Line

N109A
North South Corridor
4 Ongoing
J102 DJI_0031.JPG

Three stations and one 4.3km viaduct along with Addition and Alteration Works to the existing Choa Chu Kang Station.

J102
Choa Chu Kang Station, Choa Chu Kang West Station, Tengah Station and Viaducts
WhatsApp Image 2022-05-27 at 4.47.48 PM.jpeg

6 km South Main Sewerage Tunnel and 5.5 km South Linkway Sewerage Tunnel.

T-11
Deep Tunnel Sewerage System Phase 2

Completed Projects

5 Completed
Ceiling Frame & Panel Installation in progress at Lower Platform Level.jpg

A Thomson-East Coast Line project featuring the construction of an underground station with 2 entrances and associated tunnels

T305
Katong Park Station and  Tunnels
T310 Ariel 2023-12 edit.jpg

A Thomson-East Coast Line project featuring the construction of an underground station with 5 entrances and associated tunnels

T310
Bayshore Station and Tunnels
6 Completed
WhatsApp Image 2021-11-30 at 12.30.19 PM (2).jpeg

A 108m tunnel constructed using Rectangular Pipe Jacking Machine which connects Funan Mall to Capitol Piazza.

Funan
Underground Pedestrian Linkway
DJI_0155_edited_edited.jpg

Construction of an elevated 3-storey Gul Circle interchange station and a 3.05 km elevated MRT viaduct

C1688
Gul Circle Station and Viaducts
7 Completed
T225_Substantial Completion_edited.jpg

A Thomson-East Coast Line project featuring the construction of an underground station with 3 entrances and associated tunnels

T225
Shenton Way Station and Tunnels
C920 newton.jpg

Construction of DTL2 Newton Station along with 4 tunnels connecting it to Little India and Stevens Stations

C920
Newton Station and Tunnels
8 Completed
IMG_20190809_103539.jpg

Construction of tunnels between Woodlands Station & Woodlands South Station and between Woodlands South Station & Sembawang Airbase.

T206
Tunnels between Woodlands Station and Woodlands Avenue 12
C902%20promenade_edited.jpg

Construction of Promenade Station and 1.12 km bored tunnels

C902
Promenade Station and Tunnels
9 Completed
IMG_0875.JPG

Construction of tunnels between Tampines East and Upper Changi Stations for Downtown Line Stage 3

C923A
Tunnels between Tampines East Station and Upper Changi Station
DSCF0304.JPG

Construction of 48 m Cut & Cover tunnel and A&A works to Existing NEL Siding Tunnel

C713
North-East Line Extension
10 Completed
photo-1525625293386-3f8f99389edd.jpg

Construction of a basement retail concourse, car park and two-directional, two-line MRT section tunnels

P8402
Marina Bay Sands
Integrated Resorts Development
Holland Village3.jpg

Construction of Holland Village Station, Buona Vista Station, Kent Ridge Station and including One North Station Fit-out Works and Tunnels

C855
Holland Village Station, Buona Vista Station, Kent Ridge Station and Tunnels
11 Completed
_DSC8401.JPG

Construction of Serangoon Station for Circle Line Stage 3 with bored tunnels to Lorong Chuan and Bartley stations

C852
Serangoon Interchange Station
and Tunnels
Bras%20basah%20Station%20C825_edited.jpg

Construction of four Circle Line Stage 1 stations situated in the vicinity of Singapore's iconic landmarks such as Raffles Hotel and Chijmes

C825
Promenade Station, Esplanade Station, Bras Basah Station, Dhoby Ghaut Station and Tunnels
12 Completed
PUB DTSS_edited.jpg

Construction of bored tunnels with a total length of 5.8 km for PUB DTSS Phase 1

T-01
Deep Tunnel Sewerage System Phase 1