LTA DTL3 C923A

Construction of Tunnels between Tampines East and Upper Changi Stations

Client :
Contract :
Location :
Period :
Land Transport Authority
Build
Tuas, Singapore
Aug 2011 - Dec 2016
6.73m
EPB Machine
​
​
4,760m
Bored Tunnels

The Downtown Line Stage 3 C923A project include the construction of tunnels between Tampines East and Upper Changi Stations with a total length of 4.76km, a TBM launching shaft and eight cross passages. Two 6.35m diameter EPB machines were used to construct the bored tunnels.

C923A Awards
2013
LTA ASAC Accident Free Recognition Award
​
​