top of page
T316
Underground Infrastructure
Changi Airport
Twin bored tunnels from Changi Airport Terminal 5 to Changi Airport (CGA) Station Terminal 2
LTA TEL T305
Construction of Katong Park Station and its Associated Tunnels
Client :
Contract :
Location :
Period :
Land Transport Authority
Build
Katong Park, Singapore
Jan 2016 - Oct 2023
6.73m
EPB Machine
3,600m
Bored Tunnels
1/6
The Thomson-East Coast Line T305 project involves the construction of underground Katong Park Station with two entrances, bored tunnels between Katong Park and Tanjong Rhu Station and between Katong Park and Amber Station and two cross passages. Two 6.35m diameter EPB machines are used to construct the bored tunnels.
T305 Awards
2022
2021
2020
LTA ASAC Workplace Health Award
MOM WSH (SHARP) Award
LTA ASAC Workplace Health Award
LTA ASAC Safety Excellence Award
LTA ASAC Safety Merit Award
MOM WSH (SHARP) Award
2019
2018
LTA ASAC Best Innovation Award
MOM WSH (SHARP) Award
LTA ASAC Safety Merit Award
Related Projects
bottom of page