top of page

LTA NEL C713

North-East Line Extension

Client :
Contract :
Location :
Period :
Land Transport Authority
Build
Singapore
Oct 2011 - Dec 2014

The North-East Line Extension C713 project include a 48m C&C tunnel, two-tier box tunnel with the existing parking tunnel open up the connection. The works include traffic turn pouring, the design and construction of temporary retaining structures, soil excavation and support, tunnels and the main structure, and to connect existing water pumps, pipe, fire hose, emergency contact system to the new tunnels and other auxiliary work. The contract value is S$8.16 million.

C713 Awards
2013
MOM WSH (SHARP) Award
Related Projects
T305_Concourse_1_edited_edited.jpg
C923A
Tunnels between Tampines East and Upper Changi Stations

Construction of tunnels between Tampines East and Upper Changi Stations for Downtown Line Stage 3.

T305_Concourse_1_edited_edited.jpg
N109A
North South Corridor

An 800 m long road tunnel featuring a pair of three-lane roads to be integrated with Teck Ghee Station on the future Cross Island Line.

bottom of page