LTA DTL2 C920

Construction of underground Newton Station

Client :
Contract :
Location :
Period :
Land Transport Authority
Design and Build
Newton, Singapore
Aug 2009 - Jul 2015
6.73m
EPB Machine
5,320m
Bored Tunnels

The Downtown Line Stage 2 C920 project is a design and build project include the construction of Newton Station, four tunnels that connect Newton Station to Little India Station and Stevens Station with a total length of 5.32km and a Cable Tunnel using pipe Jacking method. Four 6.35m diameter EPS machines were used to construct the bored tunnels.

C920 Awards
2017

2015

2014
BCA Construction Excellence Award

MOM WSH (SHARP) Award

LTA Excellence Award
2013



2012

LTA ASAC Accident Free Recognition Award
LTA ASAC Environment Merit Award
MOM WSH (SHARP) Award

MOM WSH (SHARP) Award
LTA ASAC Champion
LTA ASAC Environment Excellence Award
Related Projects
T305_Concourse_1_edited_edited.jpg
C902
Promenade Station

Extension of the existing Promenade Station and construction of a 1.12 km interconnection tunnels.

T305_Concourse_1_edited_edited.jpg
C923A
Tunnels between Tampines East and Upper Changi Stations

Construction of tunnels between Tampines East and Upper Changi Stations for Downtown Line Stage 3.

bottom of page