Ongoing Projects

1 Ongoing
CR202 tunnel 1.png

Design and Construction of a 5-km long bored tunnel between Fairways Drive and Sin Ming Walk for the Cross Island Line phase two.

CR202
Cross Island Line
CR102.png

Design and construction of 6-km long tunnels between Aviation Park Station and Changi East Depot.

CR102
Cross Island Line
2 Ongoing
20221101_011623594_iOS.png

A 6m diameter tunnel undersea with a length of 1.6km and twin 2200mm & 1200mm diameter water pipelines connecting Tuas Water Reclamation Plant and Jurong Island 

TWRP Contract 1
Tuas Water Reclamation Plant
微信图片_20220923110429.jpg

Twin bored tunnels from Changi Airport Terminal 5 to Changi Airport (CGA) Station Terminal 2

T316
Underground Infrastructure Changi Airport
3 Ongoing
DJI_0337.JPG

An 800 m long road tunnel featuring 

a pair of three-lane roads to be integrated with Teck Ghee Station

on the future Cross Island Line

N109A
North South Corridor
DJI_0507.JPG

Three stations and one 4.3 km viaduct 

along with Addition and Alteration Works

to the existing Choa Chu Kang Station

J102
Jurong Region Line
4 Ongoing
5. DJI_0505.JPG

A 6 km South Main Sewerage Tunnel and 5.5 km South Linkway Sewerage Tunnel.

T-11
Deep Tunnel Sewerage System Phase 2
5 Completed

Completed Projects

T305_Concourse_1.jpg

A Thomson-East Coast Line project featuring the construction of an underground station with 2 entrances and associated tunnels

T305
Katong Park Station
T310%2520Completed%2520Station%25201_edi

A Thomson-East Coast Line project featuring the construction of an underground station with 5 entrances and associated tunnels

T310
Bayshore Station
6 Completed
WhatsApp Image 2021-11-30 at 12.30.19 PM (2).jpeg

A 108m tunnel constructed using Rectangular Pipe Jacking Machine which connects Funan Mall to Capitol Piazza.

Funan
Underground Pedestrian Linkway
DJI_0155_edited_edited.jpg

Construction of an elevated 3-storey Gul Circle interchange station and a 3.05 km elevated MRT viaduct

C1688
Tuas West Extension
7 Completed
8 Completed
T225_Substantial Completion_edited.jpg

A Thomson-East Coast Line project featuring the construction of an underground station with 3 entrances and associated tunnels

T225
Shenton Way Station
C920 newton.jpg

Construction of DTL2 Newton Station along with 4 tunnels connecting it to Little India and Stevens Stations

C920
Newton Station
IMG_20190809_103539.jpg

Design and construction of tunnels between Woodlands Station & Woodlands South Station and between Woodlands South Station & Sembawang Airbase.

T206
Tunnels at Woodlands
C902%20promenade_edited.jpg

Extension of the existing Promenade Station and construction of a 1.12 km interconnection tunnels

C902
Promenade Station
9 Completed
10 Completed
IMG_0875.JPG

Construction of tunnels between Tampines East and Upper Changi Stations for Downtown Line Stage 3

C923A
Tunnels between Tampines East and Upper Changi Stations
DSCF0304.JPG

Construction of a 48 m Cut & Cover tunnel and a two-tier box tunnel with the existing parking tunnel

C713
North-East Line Extension
photo-1525625293386-3f8f99389edd.jpg

Construction of a basement retail concourse, car park and two-directional, two-line MRT section tunnels

P8402
Marina Bay Sands
Integrated Resorts Development
Holland Village3.jpg

Construction of a basement retail concourse, car park and two-directional, two-line MRT section tunnels

C855
Holland Village, Buona Vista,
Kent Ridge and One North Station
11 Completed
_DSC8401.JPG

Construction of an underground station for Circle Line Stage 3 with interconnecting tunnels to Lorong Chuan and Bartley stations

C852
Serangoon Interchange Station
Bras%20basah%20Station%20C825_edited.jpg

Construction of four Circle Line Stage 1 stations situated in the vicinity of Singapore's iconic landmarks such as Raffles Hotel and Chijmes

C825
Promenade, Esplanade, Bras Basah and Dhoby Ghaut Station
12 Completed
PUB DTSS_edited.jpg

Construction of bored tunnels with a total length of 5.8 km for PUB DTSS Phase 1

T-01
Deep Tunnel Sewerage System Phase 1