Twin bored tunnels from Changi Airport Terminal 5 to Changi Airport (CGA) Station Terminal 2
LTA TWE C1688
Construction of Tuas West Extension Station and Viaduct
Client:
Contract:
Location:
Period:
Land Transport Authority
Build
Tuas, Singapore
2011 - 2016
3,650m
Elevated Viaduct
First Viaduct
Project in Singapore
1/3
Tuas West Extension project C1688 include the construction of one elevated 3-storey interchange station Gul Circle and 3.05km of elevated MRT viaduct. In addition, a further 600m of elevated viaduct for the Tuas South Extension (TSE) were constructed. It is STEC's first viaduct project in Singapore.
C1688 Awards
2019
2018
2016
LTA Land Transport Best Managed Project Partner Award
BCA Design & Engineering Safety
BCA Construction Excellence Award
LTA Land Transport Excellence Award
LTA ASAC Safety Merit Award
2015
2013
LTA ASAC Best WSHO & Accident Free
LTA ASAC Finalist
MOM WSH (SHARP) Award
LTA ASAC Environment Award
LTA ASAC Finalist
MOM WSH (SHARP) Award