top of page

PUB DTSS T-01

Deep Tunnel Sewerage System - Changi Tunnel

Client:         
Contract:   
Location:   
Period:    
Public Utilities Board
Design and Build
Changi, Singapore
2000 - 2005
7.2m Dia.
5,800m
EPB Machine
Bored Tunnels

The Deep Tunnel Sewerage System Phase 1 T-01 project is the first design and build project for which STECS undertake in the name of a joint venture with Woh Hup. This project features the use of New Austrian tunneling method and tunnel boring method. A 7.2m diameter EPB Machine was used to construct the bored tunnels. The contract value is S$80.6 million.

Related Projects
T225_Substantial Completion_edited_edite

A 6 km South Main Sewerage Tunnel and 5.5 km South Linkway Sewerage Tunnel.

T-11
Deep Tunnel Sewerage System Phase 2
T305_Concourse_1_edited_edited.jpg

A 6m diameter tunnel undersea with a length of 1.6km and twin 2200mm & 1200mm diameter water pipelines connecting Tuas Water Reclamation Plant and Jurong Island .

TWRP Contract 1
Tuas Water Reclamation Plant
bottom of page