top of page
T316
Underground Infrastructure
Changi Airport
Twin bored tunnels from Changi Airport Terminal 5 to Changi Airport (CGA) Station Terminal 2
PUB DTSS T-11
Deep Tunnel Sewerage System Phase 2
Client:
Contract:
Location:
Period:
Public Utilities Board
Design and Build
Singapore
2017 - 2024
3,0m & 3,3m I.D.
Slurry TBMs
11,500m
Bored Tunnels
1/8
The Deep Tunnel Sewerage System Phase 2 T-11 project include the design and construction of a 6km South Main Sewerage Tunnel, a 5.5km South Linkway Sewerage Tunnel, 15 working shafts and related facilities. The tunnel will be constructed using two 3.0m diameter slurry TBMs and three 3.3m diameter slurry TBMs.