PUB DTSS T-11

Deep Tunnel Sewerage System Phase 2

Client:         
Contract:   
Location:   
Period:    
Public Utilities Board
Design and Build
Singapore
2017 - 2024
3,0m & 3,3m I.D.
11,500m
Slurry TBMs
Bored Tunnels

The Deep Tunnel Sewerage System Phase 2 T-11 project include the design and construction of a 6km South Main Sewerage Tunnel, a 5.5km South Linkway Sewerage Tunnel, 15 working shafts and related facilities. The tunnel will be constructed using two 3.0m diameter slurry TBMs and three 3.3m diameter slurry TBMs.

Related Projects
T225_Substantial Completion_edited_edite

Construction of bored tunnels with a total length of 5.8 km for PUB DTSS Phase 1

T-01
Deep Tunnel Sewerage System Phase 1
T305_Concourse_1_edited_edited.jpg

A 6m diameter tunnel undersea with a length of 1.6km and twin 2200mm & 1200mm diameter water pipelines connecting Tuas Water Reclamation Plant and Jurong Island

TWRP Contract 1
Tuas Water Reclamation Plant