LTA DTL1 C902

Construction of the underground Promenade Station

Client:         
Contract:   
Location:   
Period:    
Land Transport Authority
Design and Build
2 Temasek Avenue, Singapore
2008 - 2013
5.8m I.D.
1,120m
EPB Machine
Bored Tunnels

The Downtown Line Stage 1 C902 project is a design and build project include the extension of construction of existing Promenade Station and 1.12km interconnection tunnels. One 6.35m diameter EPB machine was used to construct the bored tunnels. It is worth mentioned that this project won the first place in the Safety Competition for Downtown Line Projects held by the Land Transport Authority (LTA).

Related Projects
T225_Substantial Completion_edited_edite

Construction of DTL2 Newton Station along with 4 tunnels connecting it to Little India and Stevens Stations

C920
Newton Station
T305_Concourse_1_edited_edited.jpg

Construction of tunnels between Tampines East and Upper Changi Stations for Downtown Line Stage 3.

C923A
Tunnels between Tampines East and Upper Changi Stations
bottom of page