PUB DTSS T-11

Deep Tunnel Sewerage System Phase 2

Client:         
Contract:   
Location:   
Period:    
Changi Airport Group
Design and Build
Changi Airport, Singapore
2023 - 2028

The Deep Tunnel Sewerage System Phase 2 T-11 project include the design and construction of a 6km South Main Sewerage Tunnel, a 5.5km South Linkway Sewerage Tunnel, 15 working shafts and related facilities. The tunnel will be constructed using two 3.0m diameter slurry TBMs and three 3.3m diameter slurry TBMs.