top of page

LTA TEL T225

Construction of Shenton Way Station and its Associated Tunnels

Client:         
Contract:   
Location:   
Period:    
Land Transport Authority
Build
Downtown, Singapore
2014 - 2021
5.8m I.D.
2,280m
EPB Machine
Bored Tunnels

The Thomson Line T225 project include the construction of 5 storey underground Shenton Way Station. Bored tunnels between Shenton Way Station and Maxwell Station and between Shenton Way Station and Marina Bay Station. The station also has three entrances and new passageway links connecting to adjacent buildings. Two 6.35m diameter EPB machines are used to construct the bored tunnels.

T225 Awards
2021

2020

2019


2018
MOM WSH (SHARP) Award

MOM WSH (SHARP) Award

PUB Exemplary Earth Control Measures Officer Award

LTA Annual Safety, Health and Environmental Award Convention (ASAC) Contractors Challenge Shield Award
LTA ASAC Environment Excellence Award
LTA ASAC Safety Excellence Award
MOM WSH (SHARP) Award
2017




2016
LTA ASAC Contractor's Challenge Shield
LTA ASAC Environmental Excellence
LTA ASAC Best Theme Presentation
MOM WSH (SHARP) Award

LTA ASAC Contractor's Challenge Shield Finalist
LTA ASAC Environmental Excellence
MOM WSH (SHARP) Award
Related Projects
T225_Substantial Completion_edited_edite

A Thomson-East Coast Line project featuring the construction of an underground station with 2 entrances and associated tunnels

T305
Katong Park Station
T310
T225_Substantial Completion_edited_edite
T310

A Thomson-East Coast Line project featuring the construction of an underground station with 5 entrances and associated tunnels

T310
Bayshore Station
bottom of page