top of page
T316
Underground Infrastructure
Changi Airport
Twin bored tunnels from Changi Airport Terminal 5 to Changi Airport (CGA) Station Terminal 2
LTA TEL T225
Construction of Shenton Way Station and its Associated Tunnels
Client:
Contract:
Location:
Period:
Land Transport Authority
Build
Downtown, Singapore
2014 - 2021
5.8m I.D.
2,280m
EPB Machine
Bored Tunnels
1/6
The Thomson Line T225 project include the construction of 5 storey underground Shenton Way Station. Bored tunnels between Shenton Way Station and Maxwell Station and between Shenton Way Station and Marina Bay Station. The station also has three entrances and new passageway links connecting to adjacent buildings. Two 6.35m diameter EPB machines are used to construct the bored tunnels.
T225 Awards
2021
2020
2019
2018
MOM WSH (SHARP) Award
MOM WSH (SHARP) Award
PUB Exemplary Earth Control Measures Officer Award
LTA Annual Safety, Health and Environmental Award Convention (ASAC) Contractors Challenge Shield Award
LTA ASAC Environment Excellence Award
LTA ASAC Safety Excellence Award
MOM WSH (SHARP) Award
2017
2016
LTA ASAC Contractor's Challenge Shield
LTA ASAC Environmental Excellence
LTA ASAC Best Theme Presentation
MOM WSH (SHARP) Award
LTA ASAC Contractor's Challenge Shield Finalist
LTA ASAC Environmental Excellence
MOM WSH (SHARP) Award
bottom of page