top of page

LTA DTL2 C920

Construction of underground Newton Station

Client:         
Contract:   
Location:   
Period:    
Land Transport Authority
Design and Build
Newton, Singapore
2009 - 2015
5.8m I.D.
EPB Machine
5,320m
Bored Tunnels

The Downtown Line Stage 2 C920 project is a design and build project include the construction of Newton Station, four tunnels that connect Newton Station to Little India Station and Stevens Station with a total length of 5.32km and a Cable Tunnel using pipe Jacking method. Four 6.35m diameter EPS machines were used to construct the bored tunnels.

C920 Awards
2017

2015

2014
BCA Construction Excellence Award

MOM WSH (SHARP) Award

LTA Excellence Award
Related Projects
T225_Substantial Completion_edited_edite

Extension of the existing Promenade Station and construction of a 1.12 km interconnection tunnels

C902
Promenade Station
T305_Concourse_1_edited_edited.jpg

Construction of tunnels between Tampines East and Upper Changi Stations for Downtown Line Stage 3

C923A
Tunnels between Tampines East and Upper Changi Stations
bottom of page