top of page

LTA CCL1 C825

Construction of Underground Promenade Station, Esplanade Station, Bras Basah Station and Dhoby Ghaut Station

Client:         
Contract:   
Location:   
Period:    
Land Transport Authority
Design and Build
Singapore
2001 - 2008
5.8m I.D.
EPB Machine
3,200m
Bored Tunnels

The Circle Line Stage I C825 project is a design and build project which STECS undertook in a joint venture with Woh Hup and NCC. This project includes construction of Promenade, Esplanade, Bras Basah and Dhoby Ghaut Station, 3.2km TBM Tunnels, 0.6km C&C tunnel and 110m overrun tunnel using SCL method. Two 6.35m diameter mix face EPB machines were used to construct the bored tunnels. The project is situated in the heart of urban Singapore close to buildings such as Raffles Hotel, Chijmes, Singapore Arts Museum (SAM), as well as existing MRT station and tunnels.

C825 Awards
2011

2010

2009

LTA Best Design Infrastructure

BCA Construction Excellence Award

MOM WSH Performance Award
BCA Design & Engineering Safety

MOM WSH Performance Award

MOM WSH Performance Award

SCAL 3rd Safety Innovation Teams (SIT) Convention - Silver
Related Projects
T225_Substantial Completion_edited_edite

Construction of a basement retail concourse, car park and two-directional, two-line MRT section tunnels

C855
Holland Village, Buona Vista,
Kent Ridge and One North Station
T305_Concourse_1_edited_edited.jpg

Construction of an underground station for Circle Line Stage 3 with interconnecting tunnels to Lorong Chuan and Bartley stations

C852
Serangoon Interchange Station
bottom of page