LTA CCL1 C855

Construction of Underground Holland Village Station, Buona Vista Station, Kent Ridge Station and One North Station

Client:         
Contract:   
Location:   
Period:    
Land Transport Authority
Design and Build
Singapore
2004 - 2009
5.8m I.D.
EPB Machine
8,250m
Bored Tunnels

The Circle Line Stage 4 C855 project is a design and build project which STECS undertook in the name of a joint venture with Woh Hup and Alpine Mayreder. This project includes construction of Holland Village Station, Buona Vista, Kent Ridge and One North Station, 8.25km TBM tunnels and 0.35km C&C tunnel. Two 6.35m diameter EPB machines and two 6.35m diameter slurry machines were used to construct the bored tunnels.

C855 Awards
2013

2009
BCA Construction Excellence Award

MOM WSH Performance Silver Award

LTA Annual Safety Merit Award
SCAL WSH Innovation Merit Award
MOM (SHARP) Award

LTA Annual Safety Awards Certificate of Excellence
MOM (SHARP) Award
Related Projects
T225_Substantial Completion_edited_edite

Construction of four Circle Line Stage 1 stations situated in the vicinity of Singapore's iconic landmarks such as Raffles Hotel and Chijmes

C825
Promenade, Esplanade, Bras Basah
and Dhoby Ghaut Station
C852
bottom of page