Construction of underground Newton Station

Client:         
Contract:   
Location:   
Period:    
Land Transport Authority
Design and Build
Newton, Singapore
2009 - 2015
5.8m I.D.
5,320m
EPB Machine
Bored Tunnels

The Downtown Line Stage 2 C920 project is a design and build project include the construction of Newton Station, four tunnels that connect Newton Station to Little India Station and Stevens Station with a total length of 5.32km and a Cable Tunnel using pipe Jacking method. Four 6.35m diameter EPS machines were used to construct the bored tunnels.

Related Projects
T225_Substantial Completion_edited_edite

Extension of the existing Promenade Station and construction of a 1.12 km interconnection tunnels

C902
Promenade Station
T305_Concourse_1_edited_edited.jpg

Construction of tunnels between Tampines East and Upper Changi Stations for Downtown Line Stage 3

C923A
Tunnels between Tampines East and Upper Changi Stations