top of page

LTA CRL CR102

Construction of Tunnels between Aviation Park Station and Changi East Depot

Client:         
Contract:   
Location:   
Period:    
Land Transport Authority
Design and Build
Changi, Singapore
2021 - 2029
6.3m Dia.
EPB Machine
6,000m
Bored Tunnels

Contract CR102 consists of the design and construction of tunnels connecting Aviation Park station to Changi East Depot for Cross Island Line (CRL). STEC undertakes the contract in a joint venture with LT Sambo.
The project includes five shield tunnels, seven connecting passages as well as two sections of open-cut tunnels and a supporting building. The tunnels, constructed with four Earth Pressure Balance (EPB) shield machines, will pass through temporary aircraft taxiways, aviation park roads, canals, drainage pipes and other public infrastructures.",

Contract CR102 is a part of the future 50-km Cross Island Line which will be the longest fully underground rail line in Singapore.

Related Projects
T225_Substantial Completion_edited_edite

Design and Construction of a 5-km long bored tunnel between Fairways Drive and Sin Ming Walk for the Cross Island Line phase two.

CR202
Cross Island Line
T305_Concourse_1_edited_edited.jpg

Twin bored tunnels from Changi Airport Terminal 5 to Changi Airport (CGA) Station Terminal 2.

T316
Underground Infrastructure Changi Airport
bottom of page