Twin bored tunnels from Changi Airport Terminal 5 to Changi Airport (CGA) Station Terminal 2

.png)


LTA NSC N109A
North-South Corridor (Tunnel) between Sin Ming Avenue and Ang Mo Kio Avenue 3
Client:
Contract:
Location:
Period:
Land Transport Authority
Design and Build
Singapore
2016 - 2023




1/6
Contract N109A involves construction of an 800m long road tunnel featuring a pair of three-lane roads which will be integrated with Teck Ghee Station on the future Cross Island Line. The project also involves the construction of an MRT station box - an underground structure that lays the foundation for a future station - and commuter facilities, including pedestrian overhead bridges, bus stops, sheltered walkways, and cycling paths. N109A is a part of the North-South Corridor, a 21.5km expressway which will connect towns in the north to the city centre.