Singapore LTA CCL3 C852

Construction of the underground Serangoon Interchange Station
3,800 m Bored Tunnels
6.35m Diameter EPB Machine

Project: The Circle Line Stage 3 C852 project is a build only project which STECS undertook in the name of a joint venture with Woh Hup and Alpine Mayreder. This project includes construction of Serangoon interchange station, the interconnecting tunnels from Serangoon station to Lorong Chuan station, and from Serangoon station to Bartley station. Two 6.35m diameter EPS machines were used to construct the bored tunnels. The contract value is S$155.95 million.