top of page

LTA CCL3 C852

Construction of underground Serangoon Interchange Station

Client:         
Contract:   
Location:   
Period:    
Changi Airport Group
Design and Build
Changi Airport, Singapore
2023 - 2028

The Circle Line Stage 3 C852 project is a build-only project which STECS undertook in a joint venture with Woh Hup and Alpine Mayreder. This project includes construction of Serangoon interchange station, the interconnecting tunnels from Serangoon station to Lorong Chuan station, and from Serangoon station to Bartley station. Two 6.35m diameter EPS machines were used to construct the bored tunnels.

Related Projects
T225_Substantial Completion_edited_edite

Construction of four Circle Line Stage 1 stations situated in the vicinity of Singapore's iconic landmarks

C825
Promenade, Esplanade, Bras Basah
and Dhoby Ghaut Station
bottom of page