
T316
Underground Infrastructure
Changi Airport
Twin bored tunnels from Changi Airport Terminal 5 to Changi Airport (CGA) Station Terminal 2

.png)

Milestones
2021
-
Awarded the Main Contract for PUB TWRP Contract 1, design and construction of a 6m diameter tunnel with twin 2200mm and 1200mm diameter water pipelines from proposed Tuas Water Reclamation Plant to Jurong Island.
-
Awarded the Main Contract for LTA Cross Island Line Phase 1 CR102, design and construction of tunnels between Aviation Park Station and Changi East Depot.
2019
2017
2016
2014
2013
2011
2009
2008
2004
2003
2002
2001
2000
1998
1996
-
Awarded the Main Contract for LTA T316, construction of underground infrastructure at Changi Airport
-
Awarded the Main Contract for LTA Jurong Region Line Project J102 which comprises design and construction work for three elevated stations: Choa Chu Kang, Choa Chu Kang West and Tengah with a 4.3-km viaduct
-
Awarded the Main Contract for LTA N109A North-South Corridor (Tunnel) between Sin Ming Avenue and Ang Mo Kio Avenue 3
-
Awarded the Main Contract for PUB DTSS2 (Deep Tunnel Sewerage System Phase 2)
T-11 project.
-
Awarded the Main Contract for LTA Thomson East Coast Line T310 Construction of Bayshore Station and Tunnels.
-
Awarded the Main Contract for LTA Thomson East Coast Line T305 Construction of Katong Park Station and Tunnels.
-
Awarded the Main Contract for LTA Thomson Line T225 Construction of Shenton Way Station & Tunnels.
-
Awarded the Main Contract for LTA Thomson Line T206 Construction of Tunnels between Woodlands Station and Woodlands Avenue 12 including Crossover Tunnels and Reception Tunnels to Mandai Depot.
-
Awarded the Main Contract for LTA Downtown Line Stage 3 C923A Construction and Completion of Tunnels between Tampines East Station and Upper Changi Station.
-
Awarded the Main Contract for LTA C713 Construction of Proposed Extension of NEL cut and cover tunnel and Additions & Alterations on Existing NEL Siding Tunnel.
-
Awarded the Main Contract for LTA Tuas West Extension C1688 Construction of Station EW30 and Viaducts.
-
Awarded the Main Contract for LTA Downtown Line Stage 2 C920 Design and Construction of Station and Tunnels at Newton.
-
Awarded the Main Contract for Marina Bay Sands Integrated Resort Construction Contract for Bayfront Infrastructure WP8402 project. Our first project as an Independent Main Contractor.
-
Awarded the Main Contract for Downtown Line Stage I C902 Construction and Completion of Promenade Station including Associated Tunnels.
-
Awarded the Joint Venture Main Contract for LTA Circle-Line Stage 4 & 5 C855 Construction and Completion of Holland, Buona Vista and NUH Stations including One-North Station fit-out works and Tunnels.
-
Awarded the Joint Venture Main Contract for LTA Circle-Line Stage 3 C852 Construction and Completion of Serangoon Interchange Station including Tunnel.
-
Awarded the Sub-Contract for LTA Circle-line Stage 2 C822 project.
-
Awarded the Joint Venture Main Contract for LTA Circle-line Stage I C825 Design, Construction and Completion of Stations at Millenia, Convention Centre, Museum and Dhoby Ghaut including Tunnels. Our first LTA project as a Main Contractor in Singapore.
-
Awarded the Joint Venture Main Contract for PUB DTSS (Deep Tunnel Sewerage System) T-01 project. Our first project as a Main Contractor in Singapore.
-
Awarded the Sub-Contract for LTA North-East line C703 projects.
-
Awarded the Sub-Contract for LTA North-East line C704, C708, and C810.
-
Established in Singapore.