2019 © STECS All Rights Reserved.

Singapore PUB DTSS T-11

Deep Tunnel Sewerage System
11,500 m Bored Tunnels
3.0m & 3.3m Diameter Slurry TBMs

Project: The Deep Tunnel Sewerage System Phase 2 T-11 include the design and construction of a 6km South Main Sewerage Tunnel, a 5.5km South Linkway Sewerage Tunnel, fifteen working shafts and related facilities. Two 3.0m diameter slurry TBMs and three 3.3m diameter slurry TBMs. The contract value is S$472.17 million.

1/1